
Add to Cart
DESCRIPTION
PP Interlocking Flooring can be used as the surface of basketball court, tennis court, racquetball court, aerobics court, futsal court, handball court, volleyball court, badminton court, roller skating rink, roller hockey court, badminton court, gym room and other sports court.
PP Interlocking flooring is a form of glueless "floating" flooring that is among the easier types of floor to lay. The PP Interlocking flooring is made of tiles that lock together at the ends and sides via special fittings. They lock tightly enough to form a solid surface. They aren't glued or nailed to the subfloor, but merely sit on top of it. Start with a firm, solid and clean subfloor of any flooring material other than carpeting.
PRODUCT DETAILS
Product Name | PP Interlocking Floor Tile |
Meterial | High-Performace PP |
Size | 25cm X 25cm X 1.22cm |
Thickness | 1.22cm |
Rolling Load | ≥3500N |
Rebound | ≥95% |
Temperature | -30°C - 70C |
MOQ | 100 square meters |
OEM/ODM | Accept |
Warranty | 10 years indoor , 3-5 years outdoor |
Certificate | CE, SGS , EN14877, EN13501, PAHS, REACH, ISO9001, EN71 |
Feature | Recyclable, nontoxic, waterproof and so on |
Delivery Time | 7-15 days after received deposit |
Accessory | Male edge, Female edage, corner |
Packing | Carton, pallet |
PRODUCT PICTURE
FAQ:
Q1: Is your company a trading one or a factory?
A: Factory and trade (we have our own factory site.)
Q2: How can I get a sample of required material for confirming the quality?
A: Please give the exact size and thickness you need as far as possible. We would choose appropriate samples for you according to your specification.
Q3: How is your sample charge?
A: Just The cost Price of the sample, Express time will be 3 days.
Q4: How about your Minimum order quantity (MOQ)?
A: Regular product: 100 square meters per design.
Q5: What’s the delivery time?
A: Usually 7-15 days as we own 3 calendaring lines, 1 sponge production line, 2 printing machines and hundreds skilled workforce can guarantee delivery on time.
Q6: Can you help us to shorten the lead time? Because there is not enough time left for us to deliver the goods to our customer within the lead time.
A: In a way, yes, we can get our factories reschedule their production, as long as the lead time of our other customers are not affected.
Q7: What’s your payment?
A: Our payment term normally is 30% by T/T in advance as the deposit, and the balance should be paid once shipping against the copy of bill of loading, our payment mode for balance could by T/T. We also accept L/C, Paypal, and Western Union.